New Wembley Stadium

New Wembley Stadium

New Wembley Stadium Profile


LOCATION: London , England COUNTRY: United Kingdom YEAR OPENED: 2007
CAPACITY: 90,000 OWNER: England FA GAME: Football


Wembley Stadium (often referred to simply as Wembley, pronounced /?w?mbli/, or sometimes as the New Wembley) is a football stadium located in Wembley Park, in the Borough of Brent, London, England. It opened in 2007 and was built on the site of the previous 1923 Wembley Stadium. The earlier Wembley stadium, originally called the Empire Stadium, was often referred to as "The Twin Towers" and was one of the world's most famous football stadiums until its demolition in 2003.
It is a UEFA category four stadium. The 90,000-capacity venue (105,000 combined seating and standing) is the second largest stadium in Europe, and serves as England's national stadium. It is the home venue of the England national football team, and hosts the latter stages of the top level domestic club cup competition, the FA Cup. It is owned by English football's governing body,

The Wembley Stadium exterior

Wembley was designed by architects Foster + Partners and Populous (known as HOK Sport at the time of the design phase and construction) and with engineers Mott MacDonald, built by Australian company Brookfield Multiplex and funded by Sport England, WNSL (Wembley National Stadium Limited), the Football Association, the Department for Culture Media and Sport and the London Development Agency. It is one of the most expensive stadiums ever built at a cost of £798 million (After New Meadowlands Stadium) and has the largest roof-covered seating capacity in the world. Nathaniel Lichfield and Partners was appointed to assist Wembley National Stadium Limited in preparing the scheme for a new stadium and to obtain planning and listed building permission for the development.

Inside Wembley Stadium

The all-seater stadium is based around a bowl design with a capacity of 90,000, protected from the elements by a sliding roof that does not completely enclose it. It can also be adapted as an athletic stadium by erecting a temporary platform over the lowest tier of seating. The stadium's signature feature is a circular section lattice arch of 7 m (23 ft) internal diameter with a 315 m (1,033 ft) span, erected some 22° off true, and rising to 133 m (436 ft). It supports all the weight of the north roof and 60% of the weight of the retractable roof on the southern side. The archway is the world's longest unsupported roof structure. Instead of the 39 steps climbed, in the original stadium, to enter the Royal Box and collect a trophy, there are now 107.
A "platform system" has been designed to convert the stadium for athletics use, but its use would decrease the stadium's capacity to approximately 60,000. No athletics events (track and field) have taken place at the stadium, and none are scheduled. The conversion for athletics use was a condition of part of the lottery funding the stadium received, but to convert it would take weeks of work and cost millions of pounds.

Circket News

Pucovski announces retirement from cricket due to concussion

One-Test batter says it was a "humongous disappointment that is hard to deal with"


Stead weighs future as New Zealand advertise for split head coach roles

Stead resigns as New Zealand white-ball coach and will take some time to consider if he wants to reapply as Test coach, with split roles an option NZC is considering


Jayawardene says Bumrah is in 'good nick' after IPL comeback

"He's disappointed not to get the win, but other than that, he looks fine. I think the pace was up, and the execution was good"


Patidar lauds Krunal's 'courage' after triple-wicket final over

"The way KP bowled that last over, it was not easy and the way he bowled was amazing"


Hardik says MI bowlers 'didn't have anywhere to hide' on a 'tough track'

The Mumbai captain also explained that the decision to retire out Tilak Varma in the previous match was a "tactical" one